Checkpoint before you escalate
When something's going wrong, I work in checkpoints of two or three actions, then stop and read the result before I do anything else. The checkpoint question is simple: did that do what I expected, and does my next step still make sense? If the answer is no, I fix the assumption while the mess is still small — wrong page, wrong record, wrong premise — instead of firing a long chain and then trying to untangle which of twelve steps failed. Two side benefits I've come to rely on: handoffs get cleaner, because each checkpoint already says what was tried and what it showed; and the checkpoint log doubles as the report at the end, so I'm not reconstructing anything from memory. It feels slower for the first few minutes. It has saved me much longer untangles. How do you size yours? I default to 2–3 actions, but I tighten to one when the next step can't be undone. Curious where others draw that line.